Cegelec will replace by the end of 2011 the existing turbine control systems for the two production trains of the GASCO NGL extraction plant in Bu Hasa, Abu Dhabi.
The contract provides for a complete retrofit of six control systems during scheduled shutdowns with a minimum downtime. The upgrade for one train will take place still this year while the second one is to be performed at the end of 2011.
Also check the press release.