Cegelec is in charge of the general electric installations for the future, third generation (EPR) nuclear power station to be built in Flamanville (France). The contract is performed on behalf of EDF and in associaiton with Spie.
The Cegelec teams are using for this project the PDMS software during the 3D modelisation phase.
In total, some 2,000 km of cables need to be installed, representing some 600,000 man hours.