Procesamiento Energico Mexicano (Proenermex) entrusted Cegelec with the commissioning and installation of a hydroelectric unit (5.4MW) within the electrical power plant of Santa Getrudis in the State of Veracruz in Mexico.
Engineering, supply and installation of the hydroalternator set, supervision of electromechanical and civil engineering works as well as the tests will have to be executed within a 13-month tight delay.